Checklists

Checklist for Piping Isometrics: P&ID, Layout, Drafting Related

Here is a checklist for Piping Isometrics Sr. No. Check Points   P&ID RELATED 1 Following items are checked with the P&ID (IFD or later issue):   a)    Line number and pipe class.   b)    Tag nos. of equipment, instruments, special items, actuated and manual valves (if applicable).   c)    Flow direction (including flow direction of check valve)   d)    ...

Read More »

Offshore Engineering Checklist- Nozzle Orientation

Check Points Common for Horizontal or Vertical Vessel 1 Vessel modelling is completed and nozzle orientation is extracted from model & checked against latest vendor drawing. 2 30% Model review is completed and review tag related to subject vessel are closed. 3 Plant “North” is indicated. Nozzle orientation angle shall be w.r.t. north as ‘0’ degree(clock wise). 4 Any P&ID ...

Read More »

Piping Checklist for 90% 3D Model Review

90% 3D model review is a final review in 3 sets of model reviews, 30%, 60% and 90%. 90% 3D model review held when the 3D model has basically been completed. This occurs when all equipment, piping, valves, instruments, electrical, structural and other items have been modeled in 3D environment. In this review, the items to be reviewed will include ...

Read More »

Piping Checklist for 60% 3D Model Review

60% model review is one of the reviews planned in all the EPC projects execution at different stages- 30%, 60% and 90% of design completion. 60% 3D model review is an intermediate review which take place when the final structural steel, final equipment and the majority of the major piping runs, duct-work, instrument and electrical trays have been MODELLED. The ...

Read More »

Piping Checklist for 30% 3D Model Review

In all the EPC project which are been executed on 3D model, it is planned to have 3 formal model reviews at Stages 30%, 60% and 90% of design completion. These stages are linked to the project schedule in respect of the supply of engineering information from upstream disciplines (Process, Mechanical, Instruments etc.) being at a status of Preliminary, Intermediate ...

Read More »

Checklist for Nozzle Orientation

Further to my post related to requirements for preparation and issue of nozzle orientation, here is a checklist for the nozzle orientation. Project Name:   Job No:   Equipment type: HORIZONTAL/ VERTICAL Equipment Tag No.:   SL NO. DESCRIPTION Check Points   Common for Horizontal or Vertical Vessel 1 Vessel modelling is completed and nozzle orientation is extracted from model ...

Read More »

Checklist for Chapter VIII of ASME B31.3 Piping for Category M Fluid Service

GENERAL NOTES 1. This checklist shall be used only when CLIENT/COMPANY has designated Category M fluid service for any piping class. 2. Following points are applicable for metallic piping components only. Please note that the checklist shall be filled in preferably by Lead Engineer. 3. The check points listed below are not comprehensive, for detailed description please refer cross-referenced paras ...

Read More »

Checklist for P&ID Review (Offshore)

Checklist for P&ID Review (Offshore) Notes: 1. This is a generic checklist for Typical offshore platform with all facilities. For projects containing only typical Wellhead facilities Platforms / Riser Platforms / Electrical facilities platforms etc.., this check list can be filtered out for relevant items or topics not required can be stroked-off. 2. The Checker shall complete and maintain this ...

Read More »

Check List – Basic Engineering Package (BEP) Information Input/ Review

Sr. No. List BASIC / EXTENDED BASIC ENGINEERING PACKAGE CONTENT LIST (FROM PIPING REQUIREMENT) A PROCESS INFORMATION 1. Process Description 2. Process and Utility Flow Diagram 3. Process and Utility P & I Diagram 4. Utility Distribution Diagram 5. Minimum Equipment elevation summary or same information in different form 6. Equipment Process Datasheet 7. Process Critical line List 8. Hazardous ...

Read More »

Check List for Overall Piping Plot Plan

Project Name:   Job No.:   Client: Drawing No. :   Date : DD/MM/YYYY   Drawing Title : OVERALL PLOT PLAN Notes: 1. As a minimum, the checklist shall be completed for the IFA and IFC issues of the Unit plot plans. Sr. No Check Points Y/N Remarks   DESIGN     1 Complete facility with future scope (if any) ...

Read More »