| Sr. No. | List | |
|---|---|---|
| BASIC / EXTENDED BASIC ENGINEERING PACKAGE CONTENT LIST (FROM PIPING REQUIREMENT) | ||
| A | PROCESS INFORMATION | |
| 1. | Process Description | |
| 2. | Process and Utility Flow Diagram | |
| 3. | Process and Utility P & I Diagram | |
| 4. | Utility Distribution Diagram | |
| 5. | Minimum Equipment elevation summary or same information in different form | |
| 6. | Equipment Process Datasheet | |
| 7. | Process Critical line List | |
| 8. | Hazardous Area Classification drawing | |
| B | MECHANICAL | |
| 1. | Equipment Engineering Datasheet | |
| 2. | Package equipment vendor scope of work and tie in list | |
| 3. | Acceptable equipment external nozzle load | |
| C | PIPING DESIGN | |
| 1. | Preliminary plot plan | |
| 2. | Preliminary Equipment Layout | |
| 3. | Preliminary piping material specification or material selection criteria | |
| 4. | Line List with process conditions | |
| 5. | Special design requirements if any | |
| 6. | Piping Design Philosophy | |
| 7. | Instrument Process Hook up requirement | |
| Sr. No. | List | |
| 1. | Stress analysis/ Support design guidelines/ standards | |
| 2. | 3D design criteria | |
| D | GENERAL | |
| 1. | Project Description | |
| 2. | Project Design Basis | |
| 3. | Site Condition | |
| 4. | List of Design codes and standards | |
| 5. | Fire Protection philosophy and safety requirement | |
| 6. | Project schedule | |
| 7. | Project procedure if any | |
| 8. | Client’s standards if any | |
| 9. | List of statutory regulations applicable | |
| 10. | Drainage Philosophy and Requirement | |
| REVIEW REQUIREMENTS OF BASIC ENGINEERING PACKAGE | ||
| A | PROCESS AND UTILITY P & I DIAGRAM | |
| 1. | Legend sheet with information on line numbering system, valve identification system, SM numbering, Instrument numbering, Process specific requirement, Instrument process hook up requirement etc | |
| 2. | All lines are numbered. Line no. to contain, Size of pipe, Fluid code, Line sequence no., Piping material specification, Insulation/ Painting/ Heat tracing/ Jacketing requirement, Area no. if any as minimum. | |
| 3. | Valve and SM identification in the form of symbol or tag no. | |
| 4. | Instrument tag no. | |
| 5. | Equipment nozzle identification in terms of nozzle no. or tie in point no. | |
| 6. | Identification of proprietary package battery limit | |
| 7. | Specific requirement such as slope, spool, specification break, line routing criteria, gravity drain, barometric leg requirement, Valve/ Instrument location criteria etc. | |
| 8. | Line continuation to other P & I D properly marked | |
| 9. | Applicable notes | |
| 10. | Minimum equipment elevation requirement | |
| 11. | Brief equipment specification | |
| 12. | Insulation requirement on equipment | |
| 13. | Process vents and drains | |
| 14. | Utility station requirements | |
| B | EQUIPMENT PD SHEET/ ENGIEERING DATASHEET | |
| 1. | Operating and design conditions | |
| 2. | Dimensional data | |
| 3. | Support type | |
| 4. | All major nozzles located and elevation/ projection defined | |
| 5. | Maintenance requirement if any | |
| 6. | Insulation thickness | |
| C | PIPING DESIGN PHILOSOPHY IF ANY | |
| D | PROJECT DESIGN BASIS | |
| E | STRESS and SUPPORT DESIGN PHILOSOPHY IF ANY | |
| F | 3 D DESIGN PHILOSOPHY IF ANY | |
| G | LINE LIST FOR AVAILABILITY OF DATA | |
| Sr. No. | List | |
| F | PLOT PLAN | |
| 1. | Functional and Process Point of view | |
| 2. | Man and Material movement point of view | |
| 3. | Local statutory requirement point of view | |
| 4. | Space management point of view for better utilisation of space | |
| 5. | Hazard point of view – Hazardous area, Emission, Venting, Flaring etc. | |
| H | EQUIPMENT LAYOUT | |
| 1. | Functional and Process Point of view | |
| 2. | Man and Material movement point of view | |
| 3. | Local statutory requirement point of view | |
| 4. | Space management point of view for better utilisation of space | |
| 5. | Hazard point of view – Hazardous area, Emission, Venting, Flaring etc. | |
| 6. | Access, Operation and Maintenance point of view | |
| 7. | Hazardous area classification | |
| 8. | Safety | |