Checklists

Check List for Piping Layouts

Project Name: Job No.: Client: Drawing No. : Date : DD/MM/YYYY Drawing Title : PIPING GENERAL ARRANGEMENT DRAWING Notes: This checklist is intended for checking of layout drawings extracted from 3D CAD models. As a minimum, the checklist shall be completed for the first issue of the layout drawing. Items like Fire and Gas detectors and other E, I & ...

Read More »

Check List for Piping Unit Plot Plan

Project Name: Job No.: Client: Drawing No. : Date : DD/MM/YYYY Drawing Title : UNIT PLOT PLAN Notes: 1. As a minimum, the checklist shall be completed for the IFA and IFC issues of the Unit plot plans. Sr. No Check Points Y/N Remarks DESIGN 1 Plant North and True North are shown. 2 Grade and paving levels are shown. ...

Read More »

Check List for Piping Material Take-Off (MTO)

Check List for Piping Material Take-Off (MTO) Project Name: Job No.: Notes:1. This check list is applicable exclusively for Detail design engineering. 2. Some of the check points listed here are specific to manual MTO, when MTO extracted from model, ensure these are taken care in model. 3. Hydrotest vent/drain MTO shall be identified w.r.t appropriate line number. 4. Make ...

Read More »

Checklist For Helideck Design In Offshore Platform

CHECKLIST FOR HELIDECK DESIGN IN OFFHORE PLATFORM Note: 1. This Checklist is for Fixed Offshore installations only. 2. For specific requirements of Floating / mobile units (e.g. FPSO) Chapter 9 of CAP 437, CAA 2008/03 publication, Chapter 3 & 4 of ICAO Annexure 14 shall be referred for considerations on helideck locations, Dynamic Landing etc. 3. For Helicopter Winching Areas ...

Read More »